Five Things to Know About the Clean Energy Incentive Program | Norton Rose Fulbright
November 6, 2015
Sue Cowell, in Washington
While everyone is keeping an eye on how the Clean Power Plan litigation plays out, developers of wind, solar, and demand-side energy efficiency projects are also very interested in monitoring, and helping shape the development of the Clean Energy Incentive Program (CEIP).
By way of background, the Clean Power Plan requires a 32 percent reduction in CO2 emissions from affected existing electrical generation units by 2030. States are to prepare implementation plans describing how they will achieve their obligations under the Clean Power Plan; however, the EPA will implement a federal plan for those states that don't submit a plan, or fail to get EPA approval of their plans.
States can develop rate-based or mass-based implementation plans, but the EPA has expressed its preference to implement the federal plan as a mass-based plan. Since not all affected units will be able to comply with the expected limits under rate-based or mass-based plans, EPA anticipates that such units will need to acquire and submit compliance instruments, termed allowances under a mass-based system or credits under a rate-based system. Under a mass-based system, one allowance would allow the emission of one short ton of CO2. Under a rate-based system, one credit would allow one megawatt-hour of electricity generation. The CEIP presents an opportunity for allowances or credits from early investments in eligible demand-side energy efficiency measures as well as solar and onshore wind projects.
Under the CEIP, states could provide early action allowances under a mass-based plan, or credits under a rate-based plan to eligible onshore wind, solar, and demand-side energy efficiency projects. As an additional incentive, EPA could provide up to a total of 300 million short tons of CO2 in the form of matching allowances or credits to eligible states.
Five Things to Know
Here are five things to know about the CEIP as it stands now.
- EPA proposed including the CEIP in the federal plan that EPA will impose on states that fail to submit an approved plan.
- States are not required to participate in the CEIP. To participate in the program, a state must make a non-binding statement of intent to participate in the CEIP as part of its implementation plan or initial submittal that is due by September 6, 2016.
- A solar or onshore wind (offshore wind is excluded) project would be eligible under the CEIP if the following criteria are met: (i) the project is physically located in or benefits a state that submitted a final implementation plan that included the CEIP or is subject to a federal plan, (ii) project construction commenced after the applicable state submitted its final implementation plan to EPA, or after September 6, 2018 for states that don't submit a plan, and (iii) the project generates metered megawatt-hours of electricity in 2020 and/or 2021.
- A demand-side energy efficiency project would be eligible under the CEIP if the following criteria are met: (i) the project is physically located in or benefits a state that submitted a final implementation plan that included the CEIP or is subject to a federal plan, (ii) the project commenced operation after the state submitted its final implementation plan to EPA that includes the CEIP, or after September 6, 2018 for those states that don't submit a plan, (iii) the megawatt-hours of electricity are saved in 2020 and/or 2021 and are quantified and verified, and (iv) the project is implemented in a low-income community.
- EPA has not finalized the CEIP and is seeking comment on fundamental aspects like what it means to commence construction, commence operation, and exactly what will qualify as a low-income community. A more complete list of topics that EPA is soliciting comment on is included in EPA's Clean Energy Incentive Program Next Steps document.
About
The Project Finance blog reports on new developments affecting the power sector, gas pipelines, LNG terminals, energy storage facilities, energy efficiency, biofuels, gasification, water, toll roads, bridges, ports, stadiums and other infrastructure.
Topics
Archives
- November 2025 (1)
- October 2025 (1)
- August 2025 (1)
- July 2025 (1)
- April 2022 (1)
- August 2021 (1)
- November 2020 (1)
- September 2020 (1)
- July 2020 (1)
- June 2020 (1)
- May 2020 (1)
- March 2019 (1)
- February 2019 (1)
- January 2019 (1)
- December 2018 (2)
- November 2018 (1)
- October 2018 (1)
- September 2018 (2)
- August 2018 (2)
- April 2018 (1)
- February 2018 (2)
- January 2018 (2)
- December 2017 (1)
- November 2017 (3)
- October 2017 (2)
- September 2017 (7)
- August 2017 (3)
- July 2017 (4)
- June 2017 (2)
- May 2017 (3)
- April 2017 (3)
- September 2016 (5)
- August 2016 (4)
- July 2016 (6)
- June 2016 (4)
- May 2016 (3)
- February 2016 (4)
- January 2016 (4)
- December 2015 (1)
- November 2015 (2)
- October 2015 (6)
- September 2015 (5)
- August 2015 (2)
- July 2015 (2)
Stay Connected
Subscribe by Email