More PURPA Rollbacks: FERC Upends Nearly 40-Years’ of Precedent on Determining QF Size; Leaves Energy Storage Questions Unresolved
September 14, 2020
In 1981 FERC held that the size of a qualifying small power production facility (“QF”) is measured by the amount of capacity it can “send out” to the grid. (Occidental Geothermal, Inc., 17 FERC ¶ 61,231 (1981)
Read More