As predicted, the biggest winner of Contracts for Difference (CfD) in the second allocation round (AR2) was offshore wind. AR2 will bring over 3.1 GWs of offshore wind at strike prices that were up to 50 percent lower than those awarded in the first auction in 2015. Read more about the second allocation round results here.
Learn more: Round 2 results of contracts for difference
September 11, 2017