FERC Upends Nearly 40-Years’ of Precedent on Determining QF Size | Norton Rose Fulbright
                              
                                    
                                September 14, 2020
                                
                                
                            
                        In 1981 FERC held that the size of a qualifying small power production facility (“QF”) is measured by the amount of capacity it can “send out” to the grid. (Occidental Geothermal, Inc., 17 FERC ¶ 61,231 (1981)